GB/T 18487.2-2026 is the latest national standard for EMC requirements of off-board electric vehicle supply equipment. It does more than update old clauses. It pulls personal safety, RCD reliability, unified operating conditions, CPT port requirements, extended radiated bands, and CCC implementation logic into one coherent EV charger EMC compliance framework.
This page follows the same long-form structure as the AI-RAN page, breaking the topic into the standard overview, scope, edition changes, test requirements, timeline, and Greentest solutions for both search visibility and quick engineering review.
The direction of GB/T 18487.2-2026 can be summarized in eight words: tighter safety control and unified operating conditions. It moves EV charger EMC beyond a simple list of disturbance and immunity tests toward compliance anchored in personal safety, protective device reliability, and realistic usage conditions.
Total standard body and appendix length.
A fuller technical scope than the previous edition.
Official publication date.
A key EMC standard for charger certification.
| Item | Content |
|---|---|
| Standard No. | GB/T 18487.2-2026 |
| Chinese Title | Electric vehicle conductive charging system - Part 2: EMC requirements for off-board electric vehicle supply equipment |
| English Title | Electric vehicle conductive charging system - Part 2: EMC requirements for off-board electric vehicle supply equipment |
| Standard Type | Recommended national standard (GB/T) |
| Publication Date | 2026-04-30 |
| Effective Date | 2026-11-01 |
| Replaced Standard | GB/T 18487.2-2017 |
| ICS | 33.100 |
| CCS | L06 |
| Issuing Authorities | State Administration for Market Regulation and Standardization Administration of China |
| Submitted/Managed By | China Electricity Council |
The main drafting organizations include Shanghai Electrical Equipment Testing Institute, China Electricity Council, Shanghai Institute of Electrical Science, State Grid Electric Power Research Institute, China Electric Power Research Institute, Huawei, Sungrow, Bull Group, State Grid Smart Internet of Vehicles, Tesla Shanghai, and more than 30 other participating organizations.
| Edition | Year | Notes |
|---|---|---|
| GB/T 18487.2-2001 | 2001 | First release |
| GB/T 18487.2-2017 | 2017 | First revision |
| GB/T 18487.2-2026 | 2026 | Second revision and current edition |
A: It regulates EMC requirements for off-board electric vehicle supply equipment, including AC chargers, DC chargers, IC-CPD devices, portable charging devices, and similar conductive charging equipment.
A: Because it directly affects EV charger CCC implementation and adds personal safety, RCD reliability, and unified operating conditions to the formal EMC compliance criteria.
A: It covers Mode 2, Mode 3, and Mode 4, corresponding to IC-CPD devices, AC charging stations, and DC chargers.
A: The main differences are the personal safety baseline, dedicated RCD testing, unified operating conditions, a full rewrite of CPT port requirements, removal of redundant tests, extension of radiated disturbance bands, and stricter harmonic current phase-line requirements.
A: It means leakage protection is no longer treated only as a product function. Its reliable operation under EMC stress is now part of pass/fail compliance judgment.
A: ES5500 mainly covers emission testing, ES5600 mainly covers radiated immunity testing, and GtestWorks plus VectWorks support automation, sequencing, data capture, and reporting.
| Standard | Title | Purpose |
|---|---|---|
| GB/T 4365 | Electromagnetic compatibility terminology | Terminology definitions |
| GB 4824-2025 | Limits and methods of measurement of radio disturbance characteristics for industrial, scientific and medical equipment | RF disturbance limits and methods |
| GB/T 6113.102 | Specifications for radio disturbance and immunity measuring apparatus and methods | Measurement equipment requirements |
| GB/T 9254.1-2021 | EMC for information technology equipment, multimedia equipment and receivers | Reference for conducted and radiated disturbance |
| GB 17625.1 | Limits for harmonic current emissions | Harmonic current testing |
| GB/T 17625.2 | Voltage fluctuations and flicker | Voltage fluctuation testing |
| GB/T 17626.2 | ESD immunity test | ESD testing |
| GB/T 17626.3 | Radiated RF electromagnetic field immunity test | RS testing |
| GB/T 17626.4 | EFT immunity test | EFT testing |
| GB/T 17626.5 | Surge immunity test | Surge testing |
| GB/T 17626.6 | Conducted disturbance immunity induced by RF fields | CS testing |
| GB/T 17626.11 | Voltage dips, short interruptions and voltage variations | Voltage dip testing |
| GB/T 18487.1-2023 | Electric vehicle conductive charging system - General requirements | General charging system requirements |
| GB/T 19596 | Electric vehicle terminology | Terminology reference |
| GB/T 29317 | Terminology for EV charging and battery swapping facilities | Charging facility terminology |
This standard applies to off-board conductive power supply equipment with rated supply-side voltage up to 1000V AC or 1500V DC and rated maximum output voltage up to 1000V AC or 1500V DC. It covers charging Modes 2, 3, and 4, and does not apply to on-board equipment, wireless power transfer systems, or railway-related applications.
| Item | Requirement |
|---|---|
| Rated supply-side voltage | ≤1000V AC or ≤1500V DC |
| Rated maximum output voltage | ≤1000V AC or ≤1500V DC |
| Applicable charging modes | Mode 2, Mode 3, Mode 4 |
| Applicable product types | AC chargers, DC chargers, IC-CPD devices, portable charging devices, and on-site energy-storage type supply equipment |
| No. | Excluded scenario | Description |
|---|---|---|
| 1 | On-board equipment | Charging equipment installed inside the vehicle |
| 2 | Wireless charging (WPT) | Wireless power transfer systems |
| 3 | Trolleybus equipment | Power supply equipment for trolleybuses |
| 4 | Railway vehicles | Power supply equipment for railway and rail transit vehicles |
| 5 | Industrial vehicles | Power supply equipment for industrial vehicles |
The 2026 edition no longer allows teams to focus only on a traditional test checklist. It adds personal safety, leakage protection reliability, low-power operating conditions, and higher-frequency disturbance impacts to a more practical compliance model.
| No. | Core change | Type | Impact |
|---|---|---|---|
| Change 1 | Personal safety baseline | Added | ★★★★★ |
| Change 2 | Dedicated RCD testing | Added | ★★★★ |
| Change 3 | Unified operating conditions | Modified | ★★★★★ |
| Change 4 | Complete rewrite of CPT port requirements | Modified + added | ★★★★ |
| Change 5 | Removal of unreasonable test items | Removed | ★★★ |
| Change 6 | Extension of radiated disturbance bands | Modified | ★★★★ |
| Change 7 | Updated phase-line requirements for harmonic current testing | Modified | ★★★ |
The new edition explicitly states that no fire, explosion, or enclosure breakage endangering personal safety is allowed during or after EMC testing. This overrides the normal A/B/C performance criteria.
RCD reliability is now part of EMC compliance judgment, including normal charging, the EMC immunity process, and plug-in or unplug events.
Emission tests must run at 20% and 80% rated maximum power, while immunity tests must run in standby and at 20% rated power.
Conductive power transfer port requirements were systematically updated, including new normative load conditions and coordination with GB/T 18487.1-2023.
Some low-probability or overlapping tests were removed, such as certain EFT and DC-input voltage dip requirements, so resources can shift to more practical verification items.
Radiated disturbance attention extends upward from the traditional band, while harmonic current phase-line requirements become more exacting for high-power fast chargers.
| Item | Technical change | Category |
|---|---|---|
| a | Scope revised | General revision |
| b | Added terms and definitions for CPT supply equipment | Change 4 |
| c | Revised equipment configuration requirements | Change 4 |
| d | Revised test load conditions | Change 3 |
| e | Unified emission and immunity operating conditions | Change 3 |
| f | Added personal safety baseline | Change 1 |
| g | Added dedicated RCD testing | Change 2 |
| h | Added requirements for IC-CPD and portable charging equipment | General addition |
| i | Removed EFT requirement at power input ports | Change 5 |
| j | Removed DC input voltage dip requirement | Change 5 |
| k | Updated phase-line requirements for harmonic current testing | Change 7 |
| l | Added applicability of conducted disturbance measurement for DC power ports | General revision |
| m | Revised radiated disturbance test band for keyless entry systems | Change 6 |
| n | Revised general radiated disturbance band | Change 6 |
| o | CPT port conducted disturbance setup moved to an informative appendix | Change 4 |
| p | Added CPT port load conditions | Change 4 |
| q | Revised radiated disturbance test method for keyless entry systems | Change 6 |
| Criterion | Definition | Notes |
|---|---|---|
| Performance Criterion A | The equipment continues to operate as intended during and after the test | No functional loss or degradation |
| Performance Criterion B | The equipment may temporarily degrade or lose function during the test but recovers automatically afterward | Temporary effect with self-recovery |
| Performance Criterion C | The equipment may lose function but can be restored by operator intervention | Manual recovery allowed |
| Personal safety baseline | No fire, explosion, or enclosure breakage is allowed during or after the test | Immediate fail condition |
| Test item | Base standard | Level | Criterion |
|---|---|---|---|
| Electrostatic discharge (ESD) | GB/T 17626.2 | Contact ±6kV; air ±15kV | B |
| Radiated RF electromagnetic field immunity (RS) | GB/T 17626.3 | 3V/m or 10V/m, 80MHz to 1GHz | A |
| Port type | Test item | Base standard | Level/requirement | Criterion |
|---|---|---|---|---|
| AC power input | EFT | GB/T 17626.4 | ±4kV | B |
| AC power input | Surge | GB/T 17626.5 | Line-line ±2kV; line-ground ±4kV | B |
| AC power input | Voltage dips and short interruptions | GB/T 17626.11 | As specified by the standard | B/C |
| AC power input | CS | GB/T 17626.6 | 10V | A |
| DC power input | EFT / Surge / CS | GB/T 17626.4 / 5 / 6 | ±4kV / per Appendix C / 10V | B / B / A |
| CPT port | EFT / Surge / CS | GB/T 17626.4 / 5 / 6 | As specified / per Appendix C / 10V | B / B / A |
| Signal/control ports | EFT / Surge / CS | GB/T 17626.4 / 5 / 6 | As specified / as specified / 10V | B / B / A |
The new edition removes the voltage dip and short interruption immunity requirement for DC power input ports. That does not mean the risk disappears. It means the standard is concentrating more strongly on scenarios considered more practical and safety-relevant.
| Category | Item | Base standard | Condition/notes |
|---|---|---|---|
| Low-frequency disturbance | Harmonic current | GB 17625.1 | For equipment connected to public low-voltage networks; phase-line requirements updated in the new edition |
| Low-frequency disturbance | Voltage fluctuation and flicker | GB/T 17625.2 | Evaluates impact on grid voltage quality |
| RF disturbance | Conducted emission (CE) | GB 4824-2025 | 150kHz to 30MHz, QP and AV detectors |
| RF disturbance | Radiated emission (RE) | GB 4824-2025 | 30MHz to 1GHz, quasi-peak detection |
| RF disturbance | Extended radiated emission band | GB 4824-2025 | Above 1GHz, newly emphasized in the new edition |
GB/T 18487.2-2026 explicitly requires both conducted and radiated disturbance tests to follow GB 4824-2025. The equipment group and class must therefore be identified first, and the relevant limit line is selected from that classification logic.
| Dimension | Group/Class | Definition | Limit implication |
|---|---|---|---|
| Group | Group 1 | Industrial, scientific and medical equipment other than Group 2; EV chargers usually fall here | Tighter higher-frequency requirements |
| Group | Group 2 | Equipment that intentionally generates and uses RF energy | Relatively looser limits |
| Class | Class A | Industrial and commercial environments | Wider limits |
| Class | Class B | Residential and household environments | Typically 6 to 10dB stricter than Class A |
One of the most practical and design-relevant changes in the new edition is the unification of operating conditions. The requirement is no longer simply that the equipment can be tested, but that it must be tested under specified load, cable, termination, and wiring arrangements so that results are genuinely comparable across laboratories.
| Configuration item | Requirement |
|---|---|
| CPT equipment setup | Configured according to CPT charging modes in GB/T 18487.1-2023 |
| EUT terminal requirement | The EUT terminal shall be connected as specified during testing |
| Communication cables | Unified type, length, and routing |
| Port termination | Each port terminated according to the standard |
| Load type | Operating condition |
|---|---|
| Emission testing | 20% and 80% of rated maximum power |
| Constant-power equipment | Voltage upper and lower limits must be covered |
| Immunity testing | Standby and 20% rated power |
| CPT port load | According to Table B.1 in Appendix B |
Low-power and standby states often expose switching strategy, PFC control behavior, and harmonic or radiated anomalies more clearly than full-load operation.
Submission strategies become more transparent, inter-lab variation is reduced, and pre-compliance verification has to start earlier in the design cycle.
| Appendix | Type | Content | Change status |
|---|---|---|---|
| Appendix A | Informative | CPT port conducted disturbance test setup | Downgraded from normative in the 2017 edition |
| Appendix B | Normative | CPT port load conditions | Newly added |
| Appendix C | Normative | Surge test setup for DC supply equipment | Retained and updated |
| Appendix D | Normative | Radiated disturbance test for keyless entry systems | Test method updated |
| Appendix E | Normative | Voltage transient disturbance test for DC supply equipment | Retained and updated |
| Standard | Title | Relationship |
|---|---|---|
| GB/T 18487.1-2023 | General requirements for EV conductive charging systems | Coordinates with Part 2 in configuration and CPT mode definitions |
| GB 39752-2024 | Safety requirements for EV supply equipment | Mandatory safety standard referencing GB/T 18487.2 EMC testing |
| GB 44263-2024 | Safety requirements for EV conductive charging systems | Foundational safety standard for charging systems |
| GB 4824-2025 | RF disturbance limits and methods | Limit basis for conducted and radiated disturbance |
| GB/T 17626 series | Basic EMC test standards | Supports ESD, RS, EFT, Surge, CS, and related items |
Appendix D targets radiated disturbance affecting keyless entry systems. This shows the new edition is actively addressing how EV chargers may interfere with vehicle PEPS, Bluetooth, and UWB-based digital key functions.
| Time point | Event | Key action |
|---|---|---|
| 2026-04-30 | GB/T 18487.2-2026 officially released | Start product gap analysis and alignment work |
| 2026-08-01 | CCC mandatory certification starts | Equipment without CCC cannot be manufactured, sold, imported, or commercially used |
| 2026-11-01 | New standard officially takes effect | The 2017 edition is withdrawn and the industry switches to the new standard |
There are only about five months between release and full implementation. With CCC timing layered on top, companies that are weak in low-power operating conditions, RCD design chains, or higher-frequency radiated correction work will face a tight resource situation very quickly.
| Item | Content |
|---|---|
| Full name | Guangzhou Greentest Electronics Technology Co., Ltd. |
| Founded | November 2015 |
| Positioning | Engineers' testing steward |
| R&D / factory | Panyu District, Guangzhou |
| Branches | Nanning, Shenzhen, and Hong Kong |
| Website | www.greentest.com.cn |
Guide, Research, Engineer, Explore, and Norm. The idea is to start from standards, solve problems in practice, return to standards, and close the loop in the testing industry.
Greentest covers EMC solutions, new energy and automotive electronics, semiconductors and devices, automated testing, 4G/5G testing, medical devices, and optical communications.
An integrated system combining an EMI receiver, LISN, antenna sets, and automation software for CE and RE compliance measurements on EV chargers.
Covers conducted emission, radiated emission, and the extended band above 1GHz, and can also support Appendix D radiated disturbance work for keyless entry related scenarios.
A radiated RF immunity system for EV charger compliance work, focused on enclosure-port and related radiated immunity scenarios.
Mainly supports radiated immunity verification for enclosure ports and can also be used with Appendix D related immunity scenarios.
Supports standard template management, multi-standard switching, multi-instrument control, automated sequencing, data visualization, and one-click report export.
For repetitive sequences such as 20% and 80% emission operating conditions and standby plus 20% immunity conditions, automation reduces manual variation and improves repeatability.
Includes standard waveform libraries, sequence editing, waveform stitching, impedance testing, and customized reporting for complex electrical verification scenarios.
When EMC correction work needs to be linked with supply anomalies, waveform injection, or system-boundary verification, the software helps support a more complete test loop.
| GB/T 18487.2-2026 test area | Test item | Equipment | Coverage |
|---|---|---|---|
| Emission - RF disturbance | Conducted emission CE (150kHz to 30MHz) | ES5500 | Full coverage |
| Emission - RF disturbance | Radiated emission RE (30MHz to 1GHz) | ES5500 | Full coverage |
| Emission - RF disturbance | Extended radiated emission band above 1GHz | ES5500 | Full coverage up to 8GHz |
| Immunity - radiated | Radiated RF electromagnetic field immunity | ES5600 | Full coverage |
| Keyless entry radiated disturbance | Appendix D radiated disturbance | ES5500 | Full coverage |
| Keyless entry radiated immunity | Appendix D radiated immunity | ES5600 | Full coverage |
| No. | Source | Link |
|---|---|---|
| 1 | National Public Service Platform for Standards Information | https://std.samr.gov.cn/ |
| 2 | Full text release portal for GB/T 18487.2-2026 | https://openstd.samr.gov.cn/ |
| 3 | AnyTesting related report | http://m.anytesting.com/news/1964216.html |
| 4 | EET China article on the new EV charger EMC standard | https://www.eet-china.com/mp/a502903.html |
| 5 | Greentest official website and public materials | https://www.greentest.com.cn/ |
This page was organized by Guangzhou Greentest Electronics Technology Co., Ltd. under the concept of being engineers' testing steward: start from standards, solve problems in practice, return to standards, and close the loop.